Archive for the ‘Case Study (Industrial Roofing)’ Category

Ausgrid Warriewood Substation

October 25, 2017  |     |     |   Comments Off on Ausgrid Warriewood Substation

Warriewood Zone Substation, Roofing and Associated Works, Project No. AG8734/17, Warriewood Zone Substation T.S.TW16500, Samuel Street, Mona Vale, NSW 2103 Warriewood Zone Substation is situated in Mona Vale and is part of the Ausgrid pole and wire network serving the homes and businesses of the Northern Beaches district of Sydney. Ausgrid’s maintenance program required the replacement of the existing asbestos containing non-friable Galbestos roof ...

Goat Island Magazine Precinct Re-Roofing

June 21, 2017  |     |     |   Comments Off on Goat Island Magazine Precinct Re-Roofing

CLIENT: Department of Environment and Climate Change Project Case Study: The Magazine Precinct – Goat Island: The repair and maintenance of the roofs and roof accessories of the Colonial Magazine, Scow Shed, Winch House and Queen’s Magazine Addition Magazine Precinct Goat Island.   SCOPE OF WORK The project scope of works involved protection of building heritage features, roofing, roof plumbing, maintenance and other miscellaneous works. The works were ...

Fantastic Furniture 4

June 21, 2017  |     |     |   Comments Off on Fantastic Furniture 4

CLIENT: PACLIB INDUSTRIAL Project Case Study: Stages 1, 2 & 3 – Customised National Distribution Warehouse – Fantastic Furniture SCOPE OF WORK:   Murphys Roofing Installed 75,000 sq metres of Lysaght KlipLok Roof and 30,000 sq metres of custom wall cladding. At this time it was the largest Super Shed in the Southern Hemisphere, the beginning of many such projects undertaken Australian wide. A Low Line Ridge Ventilator was installed. Stainless steel ...

Bakehouse North Strathfield

May 11, 2014  |     |     |   0 Comment

PAST PERFORMANCE CLIENT: Davis-Langdon Project Case Study: Bakehouse Quarter, North Strathfield – Roof Replacement to Buildings H2 & J The Bakehouse Quarter Roof before the project showing multiple saw-tooth sections and irregular air conditioning plant equipment and penetrations.   BACKGROUND Murphy’s was engaged to perform the roofing works for Bakehouse Quarter, Roof Replacement. The client for the project was The Bakehouse Quarter and their superintendent was Davis Langdon.  ...

Bakehouse North Strathfield

PAST PERFORMANCE CLIENT: Davis-Langdon Project Case Study: Bakehouse Quarter, North Strathfield – Roof Replacement to Buildings H2 & J [caption id="attachment_1563" align="aligncenter" width="583"] The Bakehouse Quarter Roof before the project showing multiple saw-tooth sections and irregular air conditioning plant equipment and penetrations.[/caption] BACKGROUND Murphy’s was engaged to perform the roofing works for Bakehouse Quarter, Roof Replacement. The client for the project was The Bakehouse Quarter and their superintendent ...