Archive for the ‘Case Study (Hazardous Remediation)’ Category

St George TAFE Retaining Walls

December 19, 2017  |     |     |   Comments Off on St George TAFE Retaining Walls

Project Case Study: – Urgent Retaining Wall Construction and Wall Strengthening Works CLIENT: TAFE NSW Address: St George TAFE, Corner of Princes Hwy and President Avenue, Kogarah NSW 2217 SCOPE OF WORK The project scope involved urgent responsive maintenance works to two retaining walls which were cracking and at risk of collapsing. The works included: Establishment of secure fencing and signage around the failing ...

Lilyfield Orange Grove Plaza

December 19, 2017  |     |     |   Comments Off on Lilyfield Orange Grove Plaza

Project Case Study: – Lilyfield Orange Grove Plaza Concrete Spalling Repairs CLIENT: Einstein Investments Pty Ltd Address: Corner of Balmain Road and Helena Street, Lilyfield NSW 2040 SCOPE OF WORK The project scope of works involved concrete cancer repair and inspection works and can be summarised as below: Site Establishment Inspection of the suspended slab balconies, lintels and perimeter beams Review of existing drawings ...

Bondi Public School

October 18, 2017  |     |     |   Comments Off on Bondi Public School

CLIENT: Soil Conservation Service for NSW Department of Commerce Project: Bondi Public School Façade Spalling and Roof Replacement Project Enter the name and address of the project ABC project at 16 Windsor Street Wooloomoloo. SCOPE OF WORK The Project brief and Scope of Works was to Remediate the Façade and Replace the Roofing. Murphy’s were required to complete the works whilst the school remained fully occupied and live ...

Broadmeadow Roundhouse, Newcastle – Roof Remedial Works – Sydney Trains

July 04, 2017  |     |     |   Comments Off on Broadmeadow Roundhouse, Newcastle – Roof Remedial Works – Sydney Trains

Broadmeadow Roundhouse is the home of a collection of heritage locomotives and rolling stock maintained by Sydney Trains. Constructed in the age of steam, the roundhouse roof was suffering from the years with rotting timber trusses and an area of roof torn-off in extreme weather. Murphy’s in-house roofers secured and replaced the storm damaged roof section. Replacement of the trusses required the use ...

State Transit Authority (STA)

June 22, 2017  |     |     |   Comments Off on State Transit Authority (STA)

CLIENT: STATE TRANSIT AUTHORITY (STA) Project Case Study: TEMPE TRAMSHED STRUCTURE UPGRADE AND ROOF REPLACEMENT Project No: 2010/113 The project scope of works involved structural upgrades, roof replacement and other miscellaneous works. The project scope was undertaken and completed by Murphy’s Group Services and is made up of the following work descriptions and work trades: Pre-construction Site Establishment Brickwork repairs Structural steel column repairs Structural steel beam repairs and bracing Structural steel roof repairs Parapet strengthening Installation of wall ...

Goat Island Magazine Precinct Re-Roofing

June 21, 2017  |     |     |   Comments Off on Goat Island Magazine Precinct Re-Roofing

CLIENT: Department of Environment and Climate Change Project Case Study: The Magazine Precinct – Goat Island: The repair and maintenance of the roofs and roof accessories of the Colonial Magazine, Scow Shed, Winch House and Queen’s Magazine Addition Magazine Precinct Goat Island.   SCOPE OF WORK The project scope of works involved protection of building heritage features, roofing, roof plumbing, maintenance and other miscellaneous works. The works were undertaken ...

34 Morella Rd, Whale Beach

June 21, 2017  |     |     |   Comments Off on 34 Morella Rd, Whale Beach

Client: ANNA VAUGHN ARCHITECTS Project: Internal & External Refurbishment at 34 Morella Rd, Whale Beach SCOPE OF WORK:  The project scope of works included for the refurbishment to the internal & external of the building. The internal works included for new joinery & painting works, new electrical works including for new security system, minor hydraulic & mechanical works, ...

Bakehouse North Strathfield

May 11, 2014  |     |     |   0 Comment

PAST PERFORMANCE CLIENT: Davis-Langdon Project Case Study: Bakehouse Quarter, North Strathfield – Roof Replacement to Buildings H2 & J The Bakehouse Quarter Roof before the project showing multiple saw-tooth sections and irregular air conditioning plant equipment and penetrations.   BACKGROUND Murphy’s was engaged to perform the roofing works for Bakehouse Quarter, Roof Replacement. The client for the project was The Bakehouse Quarter and their superintendent was Davis ...

Bakehouse North Strathfield

PAST PERFORMANCE CLIENT: Davis-Langdon Project Case Study: Bakehouse Quarter, North Strathfield – Roof Replacement to Buildings H2 & J [caption id="attachment_1563" align="aligncenter" width="583"] The Bakehouse Quarter Roof before the project showing multiple saw-tooth sections and irregular air conditioning plant equipment and penetrations.[/caption] BACKGROUND Murphy’s was engaged to perform the roofing works for Bakehouse Quarter, Roof Replacement. The client for the project was The Bakehouse Quarter and their superintendent ...